Rylo 360° Camera

Injection Molding

With no minimum order quantities (MOQs), Fictiv makes your injection molding designs a reality. Our US and overseas manufacturing experts assist with DFM, material selection, tooling strategy and procurement logistics, while our vetted manufacturing network ensure high quality parts delivered on time.

Icon
Free Expert DFM Feedback
Icon
Vetted Local & Overseas Suppliers
Icon
No Minimum Order Quantities
Icon
Parts As Fast As 10 Days
GET AN INSTANT QUOTE

Processes

Rapid design molds

Production grade parts as fast as 10 business days, for quantities of 1 - 10k units.

  • No minimum order quantities
  • Free manufacturability feedback, pre-order
  • aluminum & P20/NAK80 steel tools
  • Master Unit Die (MUD)
  • Side actions created with hand pick out inserts
Production tooling

Production grade parts as fast as 15 business days, for volume quantities of 10k - 500k units

  • Free manufacturability feedback, pre-order
  • P20, H13, S7, NAK80, SS420 steel tools
  • Family & multi-cavity tooling
Specialized processes
  • Insert molding
  • Overmolding (rigid + elastomer)
  • Compression molding
Post processing
  • Hardware installation (e.g. heat staked inserts, ultrasonically welded inserts)
  • Pad printing
  • Silk screening
  • Painting
  • Ultrasonic welding
  • Light assembly
  • Protective Packaging/film
1

Rapid design molds

Production grade parts in 10 business days, for bridge quantities of 5k - 10k unts.

  • S50C, P20, NAK80 steel tools
  • Master Unit Die (MUD)
  • Side actions created with hand pick out inserts
  • Family & multi-cavity tools
2

Production tooling

Production grade parts in 15 business days, for production quantities of 10k - 500k units

  • P20, H13, S7, NAK80, SS420 steel tools
  • Family tool & multi-cavity tools
3

Specialized processes

  • Insert molding
  • Overmolding (rigid + elastomer)
  • Compression molding
3

Post processing

  • Hardware installation (e.g. heat staked inserts, ultrasonically welded inserts)
  • Pad printing
  • Silk screening
  • Painting
  • Ultrasonic welding
  • Light assembly
  • Protective Packaging/film

Materials

Any commercially available injection molding material, including:

1

Rapid design molds

Production grade parts in 10 business days, for bridge quantities of 5k - 10k unts.

  • S50C, P20, NAK80 steel tools
  • Master Unit Die (MUD)
  • Side actions created with hand pick out inserts
  • Family & multi-cavity tools
2

Production tooling

Production grade parts in 15 business days, for production quantities of 10k - 500k units

  • P20, H13, S7, NAK80, SS420 steel tools
  • Family tool & multi-cavity tools
3

Specialized processes

  • Insert molding
  • Overmolding (rigid + elastomer)
  • Compression molding
3

Post processing

  • Hardware installation (e.g. heat staked inserts, ultrasonically welded inserts)
  • Pad printing
  • Silk screening
  • Painting
  • Ultrasonic welding
  • Light assembly
  • Protective Packaging/film
  • Acetal (Polyoxymethylene/POM/Delrin)
  • Acrylonitrile Butadiene Styrene (ABS)
  • Glass-Filled Nylon
  • Glass-Filled Polycarbonate (GFPC)
  • High Density Polyethylene (HDPE)
  • Low Density Polyethylene (LDPE)
  • Nylon
  • Polycarbonate (PC)
  • Polycarbonate/Acrylonitrile Butadiene Styrene (PC/ABS)
  • Polyethylene Terephthalate (PET)
  • Polymethyl Methacrylate (PMMA/Acrylic)
  • Polypropylene (PP)
  • Thermoplastic Elastomer (TPE)

Mold Finishes

1

Rapid design molds

Production grade parts in 10 business days, for bridge quantities of 5k - 10k unts.

  • S50C, P20, NAK80 steel tools
  • Master Unit Die (MUD)
  • Side actions created with hand pick out inserts
  • Family & multi-cavity tools
2

Production tooling

Production grade parts in 15 business days, for production quantities of 10k - 500k units

  • P20, H13, S7, NAK80, SS420 steel tools
  • Family tool & multi-cavity tools
3

Specialized processes

  • Insert molding
  • Overmolding (rigid + elastomer)
  • Compression molding
3

Post processing

  • Hardware installation (e.g. heat staked inserts, ultrasonically welded inserts)
  • Pad printing
  • Silk screening
  • Painting
  • Ultrasonic welding
  • Light assembly
  • Protective Packaging/film
Glossy Surface, Diamond Buff Polish
  • SPI A-1 - 6000 grit diamond buff
  • SPI A-2 - 3000 grit diamond buff
  • SPI A-3 - 1200 grit diamond buff
Matte Surface, Paper Polish
  • SPI B-1 - 600 grit paper
  • SPI B-2 - 400 grit paper
  • SPI B-3 - 320 grit paper
Rough Surface, Stone Polish
  • SPI C-1 - 600 grit stone
  • SPI C-2 - 400 grit stone
  • SPI C-3 - 320 grit stone
Very Rough Surface, Dry Blast Polish
  • SPI D-1 - 600 grit, dry blast glass bead #11
  • SPI D-2 - 400 grit, dry blast #240 oxide
  • SPI D-3 - 320 grit, dry blast #24 oxide
Texture
  • Mold-tech equivalent textures
Colors:
  • Pantone color matching
  • RAL color matching
  • Physical sample color matching
GET AN INSTANT QUOTE

FICTIV VIRTUAL MANUFACTURING

EVERYTHING IN ONE PLACE

Easily upload native CAD & 2D drawings
Skip the emails and let us know your exact project needs
Get a quote for your project instantly
Get in-context feedback with our cloud-based 3D viewer
Review manufacturing recommendations and warnings
Respond or upload revisions on the spot
Track multiple orders in one place
See exactly where your project is in the production process
Trusted by fast-moving teams
"Fictiv was able to get our mold up and running within four weeks, whereas other partners were taking eight weeks just to get first-off tool parts."
“Fictiv has great pricing, great communication and they provide you with everything you need in terms of manufacturing and design feedback."
“It was a team effort with Fictiv that enabled us to take this product that’s fairly complex and turn it into a product that could be manufactured and meet the functional requirements that we had in mind.”

LEAD TIME

Same-day Vero

We provide same-day production and delivery for Vero 3D printing material.

24 hour production

We provide standard (2 day) and rush (1 day) production speeds for all 3D printing materials

Same-day shipping

For delivery, you can:

  1. Receive parts via same-day courier service
  2. Pick up parts from our local San Francisco office
  3. Select Fedex shipping