Start generating revenue 2x faster with one partner for your full BOM

Get custom and standard parts from a single source—with program support that scales alongside your team at every stage of the journey.

Bring your next breakthrough to market months faster

Fast-turn custom manufacturing and standard component sourcing under one roof—backed by ISO-certified quality management and program support built for hardware teams moving fast. 

Faster time to revenue

Every handoff is a risk and a slowdown. One partner means tighter cycles and a shorter path to market.

Supply chain without the overhead

Built-in program management acts as your supply chain function—no hiring required.

Prototype-to-production continuity

No re-qualifying vendors when R&D hands off to production. Your partner already knows the parts.

DFM that prevents 6-figure mistakes

Tooling errors cost months and capital. Automated DFM catches issues early; expert review ensures your design scales. 

Quality docs your investors and customers expect

ISO-certified QMS and full traceability at every step—ready for enterprise deals, regulatory review, or due diligence.

Book a demo

One partner. Everything your BOM needs.

Custom parts, standard components, secondary processes, and assemblies—coordinated by a single program manager who knows your program.

$1M saved on tooling for Lunar Energy

  • +2x faster time to production
  • $1M saved on tooling
  • 700 engineering hours freed
  • 6–8 week tooling turnaround vs. 4–6 months standard
“Their speed was critical in helping us meet aggressive project timelines.”

—Mark Rohan,

VP of Operations, Lunar Energy

Read the case study

6 months faster to market for Purcell

  • 6 months faster to market
  • $100K in additional revenue
  • 38% savings on tooling
  • 40% reduction in lead times
  • 20% increase in product margins
“Every day without a finished product is a day without sales and revenue. Fictiv enabled us to go to market six months faster, for $100,000 in additional revenue.”

—David Conway,

Co-Founder, Purcell

Read the case study

170 assemblies delivered 4x faster for a global consumer electronics company

Fictiv machined 5,610 sub-parts, sourced 89,420 standard components via MISUMI, and delivered 170 full assemblies ahead of schedule—sequenced by assembly dependency to eliminate idle time.

  • 4x faster than traditional suppliers
  • 3 months pulled forward
  • 170 assemblies in under 2 months
  • 60–90 days saved through DFM collaboration alone
Read the case study

Fictiv + MISUMI by the numbers

Fictiv

4

global supply chain regions—U.S., Mexico, India, China

200K

machine hours per month

40M+

parts delivered 

250+

vetted manufacturing partners

MISUMI

30M+

global products

3,000

trusted brands

200K+

shipments per day

40+

global manufacturing and distribution centers

Ready to accelerate?

Talk to a Fictiv + MISUMI solutions expert and get a plan tailored to your program timeline, team size, and production ramp.

Book A Demo

FAQs

We're Series B and still building out our supply chain team. Is Fictiv + MISUMI a good fit before we have that function in place?

icon arrow

What’s the difference between what Fictiv handles and what MISUMI handles?

icon arrow

Can you handle both prototyping and production, or do we need to re-qualify at scale?

icon arrow

How does DFM work, and when does it happen?

icon arrow

What does quality management look like at scale?

icon arrow

How fast can you move on prototypes?

icon arrow

We source a lot of standard components. Can MISUMI replace our current distributors?

icon arrow

What industries do you serve?

icon arrow