CNC Machining
Tolerances as tight as ±0.0001". 45+ materials. As fast as 1 day.
View Specs
Select a manufacturing process to view detailed specifications, tolerances, materials, and design guidelines.
Tolerances as tight as ±0.0001". 45+ materials. As fast as 1 day.
View SpecsLaser cutting, bending, welding. AL, steel, SS. 5–15 day lead time.
View Specs6 technologies: FDM, SLA, SLS, MJF, PolyJet, Carbon DLS.
View SpecsRapid to production tooling. T1 samples in 10 days. Full PPAP.
View SpecsAnodizing, powder coat, plating, ENP, passivation & 8 more.
View SpecsGeometric tolerancing symbols, feature control frames, modifiers.
View SpecsMost engineers start with material and volume. Here's a quick comparison.
Best For
Precision metal & plastic
Materials
Metals, plastics
Lead Time
1–10 days
Qty Sweet Spot
1–10,000
Tolerance
±0.0001"
Best For
Mid to High-volume
Materials
Thermoplastics
Lead Time
2–6 weeks
Qty Sweet Spot
200-1M+
Tolerance
±0.005"
Best For
Enclosures, brackets
Materials
AL, steel, SS
Lead Time
2 - 14 days
Qty Sweet Spot
1–50,000
Tolerance
±0.005"
Best For
Complex geometry
Materials
Plastics, resins
Lead Time
1–5 days
Qty Sweet Spot
1–500
Tolerance
±0.005"
Best For
Complex metal at vol.
Materials
AL, zinc, mag.
Lead Time
3–8 weeks
Qty Sweet Spot
1K–500K+
Tolerance
±0.002"
Best For
Low-vol plastic
Materials
PU resins
Lead Time
10–15 days
Qty Sweet Spot
1–200
Tolerance
±0.010"
Best For
Rubber & composite
Materials
Thermoset, rubber
Lead Time
3–6 weeks
Qty Sweet Spot
100–50K
Tolerance
±0.010"
ISO 9001:2015
Quality Mgmt
ISO 13485:2016
Medical Devices
AS9100D
Aerospace
IATF 16949:2016
Automotive & Electric Vehicles
NADCAP
Special Processes
Upload your CAD file for instant DFM feedback and pricing.
ISO 9001:2015 Certified · 95.4% On-Time Delivery · Trusted by 3,000+ Companies