Tracking

CNC Machining Materials

PVC

At a glance

Processes

CNC Mill
CNC Lathe

Lead Time

As fast as 5 days

Finishing Options

Available as-machined

Tolerance

With drawing: as low as +/- 0.005 mm
No drawing: ISO 2768 medium

About the Material

Chemical-Resistant PVC (Polyvinyl Chloride) is a great choice for designs requiring electrical insulation. Chemical-Resistant PVC also offers terrific resistance to alkalies and acids, which makes it the ideal choice for applications related to chemical-processing and tank/valve components.

Material Properties

Chemical-Resistant PVC

Yield Strength (tensile)

7,000 PSI

Elongation at Break

Hardness

Rockwell R110-R120

Density

1.38 g/cm^3
0.05lb / in^3

Material Finish

PVC has an opaque, gray finish when machined. It has a smooth, matte appearance post machining and can be machined to a variety of surface roughnesses.

Design Recommendations

Min Wall Thickness

0.5 mm (0.02 in)

Min End Mill Size

0.8 mm (0.03 in)

Min Drill Size

0.5 mm (0.02 in)

Max Part Size

1200 x 500 x 152 mm [x,y,z] (mill) 152 x 394 mm [d,h] (lathe)

Undercuts

Square profile, full radius, dovetail profiles

Radii : Depth

Depth must not exceed 12x drill bit diameter. For end mills, depth must not exceed 10x tool diameter.

Cost Saving Tip

To reduce costs, limit the number of part setups, the number of inspection dimensions or tight tolerances, and deep pockets with small radii.

YOU MIGHT ALSO BE INTERESTED IN

Fictiv Introduces and demonstrates New AI Capabilities & Mold Flow Library at NPE2024

SAN FRANCISCO BAY AREA, April 24, 2024—Fictiv, a global manufacturing company with manufacturing centers in Mexico, India, China, and the USA, will debut innovations for its Injection Molding offerings at this year’s NPE2024 show in Orlando. The show is hosted by the Plastics Industry Association, and Fictiv will be in Booth S26140. As artificial intelligence […]

Learn More

Introducing PPAP with Fictiv

There are many aspects of manufacturing that can make or break a production timeline, and few are as important as quality for a program’s schedule and success. You can go as fast as possible, but if the end result isn’t in-spec, any extra time will be spent fixing the problems. This doesn’t account for money […]

Learn More